The Zest WEG Group has manufactured and commissioned its first locally-made new generation CF11-M modular variable speed drive (VSD)
Energy
UAE loan for Kenya power project
![After completion of the project, power will be supplied to 35,460 homes in 66 different areas in 24 states across Kenya. (Image source: Strupey/Flickr)](/images/power__Strupey.jpg)
After completion of the project, power will be supplied to 35,460 homes in 66 different areas in 24 states across Kenya. (Image source: Strupey/Flickr)
The Abu Dhabi Fund for Development has lent the government of Kenya close to US$100mn for an electricity project
Wind turbine blade maker to expand into South Africa
![LM Wind Power will be looking for a suitable site location for a blade manufacturing facility on the coast of South Africa between Cape Town and the Port Elizabeth. (Image source: gvgoebel/Flickr)](/images/windblade__gvgoebel.jpg)
LM Wind Power will be looking for a suitable site location for a blade manufacturing facility on the coast of South Africa between Cape Town and the Port Elizabeth. (Image source: gvgoebel/Flickr)
Wind turbine blade maker LM Wind Power has announced plans to expand its manufacturing base into South Africa
CESI wins power projects in Saudi Arabia, Ethiopia, Kenya and Uzbekistan
![CESI has strengthened its position in Middle East and Africa with these power projects. (Image source: Oran Viriyincy/Flickr)](/images/power__Oran_Viriyincy.jpg)
CESI has strengthened its position in Middle East and Africa with these power projects. (Image source: Oran Viriyincy/Flickr)
Engineering and power solutions provider CESI Middle East (CESI) has won three smart grid and high-voltage, direct current (HVDC) projects in Ethiopia, Kenya, Saudi Arabia and Uzbekistan
Aggreko aids Tunisia to meet summer power demands
![The additional generation capacity was placed at strategic locations across the country for a period of two months to act as a back-up for the Tunisian grid. (Image source: Aggreko plc)](/images/aggreko.jpg)
The additional generation capacity was placed at strategic locations across the country for a period of two months to act as a back-up for the Tunisian grid. (Image source: Aggreko plc)
Aggreko has delivered a 120MW temporary power package to Tunisia in an attempt to consolidate and secure local power supplies during the summers