
The power will be connected to the national grid through a transmission line that will be built from Makambako in Njombe Region to Songea. (Image source: sxc.hu)
The Tanzania Electric Supply Company (Tanesco) and Symbion Power have inked a memorandum of understanding (MoU) to build a 400 MW power plant in the Mtwara region of Tanzania