Ghana’s Takoradi Port is set for a major boost to its cargo handling and ship repair capabilities, with the commencement of a US$98mn Berth-19 expansion project and a separate US$137mn investment in a new integrated ship repair and maintenance facility
Led by the Ghana Ports and Harbours Authority (GPHA), the 26-month Berth-19 project will address capacity constraints at the existing dry bulk terminal and accommodate growing volumes of mineral ores and industrial raw materials moving through the port.
The 300-metre expansion is estimated to cost almost US$100mn, with funding from GPHA, working alongside China Harbour Engineering Company (CHEC).
President John Dramani Mahama attended the groundbreaking ceremony, highlighting the need to expand the terminal to accommodate rising trade volumes.
“The dry bulk terminal has been constrained,” he said, “and so there has been the need to expand the dry bulk terminal so that we can handle more of the ores that are being exported and also handle more of the dry bulk products that are coming in.”
Mahama noted that Takoradi Port had evolved considerably from its original colonial-era role as an export point for raw materials such as timber, cocoa, bauxite and manganese, which were shipped overseas for processing.
Today, the port has developed into an important import and export hub, with specialised terminals supporting container operations, oil and gas services and dry bulk cargo handling.
The dry bulk terminal handles mineral ores for export, as well as imported clinker used by cement factories operating in the area, making the expansion important to both the mining and manufacturing sectors.
The president also highlighted dredging works undertaken at the port, which have increased its depth to 16 metres, paving the way for larger vessels and growing maritime traffic.
The Berth-19 project forms part of a wider investment programme in port infrastructure, which includes developments at Tema Port and the proposed Western Railway Line.
These initiatives are expected to improve the movement of goods across the country.
Construction of the Berth-19 expansion is expected to be completed within 26 months.
Ship repair facility
Separately, Mahama also marked the commencement of Project Shiprite, a new integrated ship repair and maintenance facility valued at around US$137mn.
Being developed by Prime Meridian Docks Ghana Limited, the facility is designed to serve cargo and offshore vessels and strengthen regional ship repair capacity.
Mahama highlighted the project’s strategic importance, stating that it “fills a very good vacuum”.
At present, many vessels, including oil rigs operating along the Gulf Coast and ships from Nigeria, have no local maintenance options and must travel to Europe or South Africa for repairs.