Zest WEG, a leading manufacturer of custom-engineered mobile power solutions, has supplied a mobile switching station to Electricidade de Moçambique (EDM), Mozambique’s national power utility, for rapid deployment wherever needed
Energy
Wärtsilä launches next-generation grid balancing engine solution
The technology group Wärtsilä has released its next-generation grid balancing technology, designed to provide flexible grid capacity and enable renewables to perform at lower costs
Africa’s first integrated hydrogen plant edges closer
Egypt Green, a green hydrogen plant located in Ain Sokhna, Egypt, which is owned, built, and operated by Fertiglobe, Scatec ASA, Orascom Construction and The Sovereign Fund of Egypt, has reached a significant milestone in its delivery with the commissioning of the first phase
Wärtsilä: maximising share of renewables is the soundest, cheapest and cleanest power strategy available to Mozambique
Speaking at the Wärtsilä Mozambique Energy Forum in Maputo, in the presence of the country’s main energy decision-makers, energy experts from Wärtsilä presented the latest results of an in-depth study which models the role that renewable energy can play in building the most cost-effective and reliable power system in Mozambique
World Bank: Ghana can turn climate challenges into opportunities for sustainable growth
The World Bank Group’s new Country Climate and Development Report (CCDR) for Ghana has estimated that at least one million more people could fall into poverty due to climate shocks, if urgent climate actions are not taken