
The conversion of six Wärtsilä engines to Wärtsilä 50DF dual-fuel engines will enable Senelec to provide highly flexible, fast-starting baseload power from Bel-Air plant. (Image Source: Wärtsilä)
Wärtsilä will convert the close to 90 MW Bel-Air power plant in Dakar to operate on liquefied natural gas (LNG)