
A total of 69km of the corridor will be fully designed and asphalted with construction of bridges and drainage. (Image source: Hitchster/Flickr)
Arcelor Mittal and the Liberian Public Works Ministry have entered into a US$40mn MoU to jointly construct the Ganta-Yekepa corridor in Nimba County